SpectraLink SCO408 telephone
Product Support Information
SPECTRALINK SCO408 MANUAL
http://www.spectralink.com/
Table of contents
View All 

• About This Document
• SpectraLink Corporation Model Numbers
• Related Documents
• Customer Support Hotline
• Icons and Conventions
• Link Wireless Telephone System Overview
• System Operation
• The Front Panel of the MCU
• Site Preparation
• Installation Steps
• Materials Required by Customer
• Determine Location of MCU
• Run Cable for System
• Run Cables to Base Station Locations
• Pull Cable
• Terminate Cable at Base Station Locations
• Prepare Demarc Blocks
• Install Demarc Blocks
• Assign and Program Ports
• Connect Cables from Base Stations and Phone Lines to Demarc...
• Install Base Stations
• Mount Base Stations on Dropped Tile Ceilings
• Mount Base Stations On Finished Ceilings
• Install Outdoor Base Stations
• Sample Schedule for Installation
• Link Wireless Telephone Planning Worksheet
• Base Station Location Worksheet
View All 

http://www.spectralink.com/
Table of contents
View All 

• About This Document
• SpectraLink Corporation Model Numbers
• Related Documents
• Customer Support Hotline
• Icons and Conventions
• Installation Overview
• OAI Overview
• System Diagram
• The OAI Gateway’s Front Panel
• Installing the OAI Gateway
• Mount OAI Gateway to Wall
• Conduct Power On Test
• Connect the OAI Gateway to the MCU
• Connect the OAI Gateway to the Application Server
• Assign OAI Function Key
• Certification Test
• Troubleshooting
View All 

1f65e4f1aab8090072465a77f457b052646174653d323030382d31322d3032267573657269643d3539303333303131


